       The New MSP Facility


The Mississippi Steel Processing facility is 135,000 ft2, comprised of 72,000 ft2 of master coil storage, 55,800 ft2 finished
goods storage and 7200 ft2 of office space. You can watch it being built through time lapse photography at   this link.          

       We envision a final facility of 290,000 ft2 through these future additions:

                 • Phase 2 adds 36,000 sq. ft. of Hot Rolled P&O storage space (rail served)
               • Phase 3 adds 72,000 sq. ft. of master coil and processing space
               • Phase 4 adds 45,000 sq. ft. of finished goods and manufacturing space
 
 

Our Phase 1 Equipment Consists of:

               • Slitting area serviced by drive-through bay with 30 ton crane & three forklift tailboards
               • Cut-to-Length area serviced by two drive-through bays with two 30 ton cranes with
                  dual 15 ton hoists
               • Master Coil Storage serviced by two 50 ton cranes with 45 ton power rotating coil grabs
 

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

 
        Copyright © 2011 Mississippi Steel Processing, LLC. All Rights Reserved.
400 N. Steel Road  •  Columbus, MS 39701  •  662 327-3150  •  662 327-2277 fax